Innovator: Preparing for safe operations
Operating for ConocoPhillips offshore Norway, Mærsk Innovator needed to be able to work above the design airgap of 45 metres.
Read about our experiences tackling challenges globally
Operating for ConocoPhillips offshore Norway, Mærsk Innovator needed to be able to work above the design airgap of 45 metres.