Valiant drilling successfully with a customised MPD system

Managed pressure drilling (MPD) has been lacking in the US Gulf of Mexico for a long period.

Valiant drilling successfully with a customised MPD system

The Maersk Valiant presented an opportunity for ConocoPhillips and Marathon Oil to bring a state-of-the-art seventhgeneration drillship into the Gulf with an MPD system. The system needed to handle high and low flow rates, large cuttings and a high cuttings volume, and measure flow more accurately. Rather than just counting pump strokes, our customers wanted flow meters on all pumps, and to be able to feed this data into their hydraulics model. Maersk Drilling and the Maersk Valiant crew successfully drilled two challenging wells using this customised MPD system.

Read more

Maersk Convincer 1.jpg
Convincer Drilling HPHT offshore Malaysia
DSC 2118.jpg
Convincer: Fuel efficiency
Maersk Developer 3.jpg
Developer: Successful reactivation in Colombia
Maersk Developer 1.jpg
Creating local jobs in Trinidad Tobago
Maersk Discoverer  0195 (1).png
Discoverer Drilling HPHT wells offshore Egypt
Maersk Discoverer 2.jpg
Discoverer: Shallow Water DP Record–Record-breaking 285m FS-2 well
msk+deliverer 0265.png
Deliverer Creating local content in Angola
Maersk Deliverer 2.jpg
Deliverer: Water depth record deployment of PMCD
Maersk Explorer 1 (1).jpg
Implementing self-verification onboard Maersk Explorer
IMG_0021.jpg
Explorer: A good year in Shah Deniz
Maersk Highlander 4.jpg
Highlander off to a head start
MAERSK SG 08-06-16 0017.jpg
Operating in MPD
Maersk Gallant 1.jpg
Gallant drills to record depths on Norwegian shelf
Maersk Gallant 3.jpg
Gallant successfully abandons seven subsea wells in the North Sea
JMI 5287.jpg
Integrator: Increasing energy efficiency
Integrator.jpg
Integrator: Diverter line modification
Interceptor xx.jpg
Interceptor setting a Norwegian record by drilling more than a mile in one day
K Interceptor.jpg
Interceptor: An industry first with sand screen running
picture from article.png
Intrepid: Maximising performance in Norway
Intrepid 5.jpg
Intrepid: Hi-tech rig on Martin Linge field
100-0004 IMG.jpg
Drilling the undrillable
ds460-0586 (Large).png
Innovator: Preparing for safe operations
Invincible.jpg
Maersk Invincible: world’s first jack-up running on shore power
IMG_6671.JPG
Invincible: Performing P&A – safely and efficiently
Images05.jpg
Resolve: Achieving Danish safety case in record time
Resolve.jpg (1)
Resolve: Drilling HPHT wells in the North Sea
March09 1.jpg
Resolute: Collaborating for efficiency
Resolute.jpg (1)
Maersk Resolute performs after reactivation
1520-0165.jpg
Reactivation of Reacher
1520-0090.jpg
Reacher: Successfully abandoning wells offshore Norway
NeilCorder-2252.jpg
Two perfect HSE periods for Resilient
Maersk Resilient 2.jpg
Resilient setting new benchmarks for completing workovers
AJ7P2089 (3).png
Valiant: Driving Energy Efficiency to reduce costs and CO2 emissions
Voyager-66.jpg
Maersk Rigworld Ghana Ltd – A joint venture to be proud of
Venturer-nosmoke.jpg
Venturer: Spudding the world's deepest well in strong currents
Voyager-44.jpg
Voyager: Completing 200 days ahead of schedule in Ghana
SIN-Korea 2015 247.jpg
Voyager: Generating shared value in Ghana
AJ7P0136 (1).png
Viking facing some of the highest pressures in the offshore industry
Viking.jpg
Viking: Extended flow back operations in the US Gulf of Mexico
Maersk Convincer 1.jpg
Maersk Convincer: Shell Jack-up of the Year 2018
Developer.jpg
Mærsk Developer: Shell Floater of the Year 2018
Interceptor xx.jpg
Interceptor - Reliability & Efficiency
Interceptor xx.jpg
The advantages of using jack-ups for subsea drilling
Drillship - AJ7P9982.png
Rising to the crewing challenge in Angola
Maersk Drilling is headquartered in Lyngby, Denmark
A unique financial position in offshore drilling
Supply Chain Globe
Ensuring that the chain doesn’t break
DISCO Renata
COVID-19: Going that extra mile
Maersk17
COVID-19 Blog: How do you prepare for the unpredictable?
Viking.jpg
Setting a world record in the time of COVID-19
Maersk INFOGRAPHIC Corona Final AIRBRIDGE
The Maersk Bridge
Resolute.jpg (1)
Moving the SPS to a virtual space
Maersk19
What we’ve learnt from the COVID-19 pandemic so far
FULL Maerskdrilling Maerskinvincible 091019 7158
Record for Maersk Invincible: 2278m drilled in one day
AJ7P2089 (3).png
Upgraded for MPD excellence