In June 2018, operator AkerBP was in a need of a rig to perform an appraisal of the Hanz field. At that time, Maersk Intrepid
was assigned to Equinor at the Martin Linge field.

Intrepid: Maximising performance in Norway

Within only three weeks, a sublet between the parties was agreed – the rig was moved from Martin Linge to Hanz, and spud was done.

Intrepid’s time at Hanz included a record of 414 “dry hole days”. Such a performance was made possible by the rig’s ability to drill 1,500m in 12¼” section and 1,300m in 8½” section within 24 hours. Intrepid’s offline capacity maximised the performance, resulting in casing and trip speed exceeding all expectations.

Read more

Voyager-44.jpg
Equatorial Guinea - creating long-term value on a short-term contract
Voyager.jpg
First successful delivery of virtual DWOP to Total Angola
HSE_Banner2.png
Maersk Drilling sees best safety statistics in five years
Intrepid 222 (2)
Maersk Drilling COVID-19 Task Force takes proactive approach and leverages key learnings
AJ7P2089 (3).png
Upgraded for MPD excellence